Keep production moving and deliveries on time

Paloma revises schedules and prepares material requirements on an operations management platform that adapts to how you run your business.

Book a call →

Backed by:

Y Combinator

Founders from:

DeelRevolutColumbia University

Every late material costs output and on-time orders

When a material arrives late or an order changes, planners rebuild the schedule across the ERP, spreadsheets and group chats while the floor follows old priorities.

Paloma can take on the schedule updates and shortage checks that keep planners chasing, so changed orders reach the floor sooner.

Capacity goes to the wrong jobs

Jobs that no longer fit the plan keep running, using capacity needed for other work.

Customers hear about delays first

Orders pass their promised dates before anyone flags the delay, leaving customers to discover it first.

Planners lose the day to chasing

Planners chase updates and confirmations, leaving little time to plan the next jobs.

Paloma checks every stage, from materials to dispatch

For batch production, packaging and assembly, the system carries orders through material planning, scheduling and dispatch, flagging delays while your team can still act.

01 · Materials

Catch shortages before scheduling

Material requirements drawn from open orders show buyers which inputs are missing before jobs reach the line.

Materials →

02 · Scheduling

Put jobs in a workable order

The revised schedule accounts for confirmed delays, materials and capacity, putting jobs in an order the floor can handle.

Scheduling →

03 · Production

Find the causes of lost output

Production reports connect downtime and yield records to the stops and shortfalls behind missing output.

Production →

04 · Dispatch

Resolve delays before customers notice

The dispatch list flags orders slipping from promised dates, giving your team time to act before customers notice.

Dispatch →

Example: replanning around a late material

Today

  1. Purchasing learns that a delivery will be late.

  2. Planners search their schedules for jobs needing the delayed material.

  3. Production starts before the revised priorities reach the floor.

Redesigned

  1. Software

    finds the jobs that depend on the missing material.

  2. Software

    checks those jobs against stock on hand and capacity.

  3. Software

    prepares a revised order of jobs from those checks.

Paloma writes down your planners' rules and follows them

We write down how planners choose between competing jobs, so the schedule follows the reasons behind those choices.

Keep job priorities consistent

The system applies the job priorities we record with your planners, keeping the daily schedule consistent.

Keep exceptions with the schedule

We record the conditions that change job order, so later schedules account for the same exceptions.

Carry knowledge across shifts

A planner covering another shift can use the written rules without waiting for an experienced colleague to return.

Paloma works with the ERP you already run

Keep orders connected

We connect ERP orders and production records, bringing them into the schedule without replacing the ERP.

Use the working schedule

We use spreadsheet schedules and cost records to rebuild planning in the system, removing the need to maintain separate sheets.

Bring floor updates together

Shop-floor records and group chats supply output, downtime and quality updates, giving planners the details previously scattered between them.

Your planners decide what runs automatically

Paloma acts on its own where you have approved it and asks a person where you have not.

Approve what runs on its own

You choose which schedule updates Paloma makes by itself; everything else waits for a person.

Get answers with evidence

Each answer includes its source records and calculations, giving planners the evidence behind the result.

Review the tested schedule

We build, run and check the schedule beside production; your team reviews and approves it before anything changes on the floor.

Start with one tool your planners test first

We start by mapping a schedule or report with the planners who use it, then connect the records it needs. Those records can later support stock decisions and cost analysis.

  1. 01

    Book a call.

    We discuss the schedule changes you handle by hand and whether there is a useful place to start.

  2. 02

    Pick the way in.

    We scope a schedule update or a production report, or explore Speedrun to find a starting point.

  3. 03

    First workflow, live.

    We build and run the schedule or report beside production, and your team reviews the result as we improve it.

Book a call →

FAQ

Can operators use plain language?

Yes. Operators can ask about jobs or production records through chat, voice or WhatsApp, using everyday language.

Can production reports arrive on a schedule?

Yes. Recurring reports arrive through WhatsApp or email, so the team receives them without requesting a fresh report each time.

How do plants with different processes start?

We map the jobs, definitions and exceptions at the first plant; later builds use what we have learned and account for each plant's differences.

How often do we review what comes next?

We review the work with you every month and keep improving what we have built.

Who owns the connected production data?

You do. We connect your ERP, spreadsheets and other records in a data warehouse you own.

Tell us where your production plan keeps changing

We can discuss how a late delivery changes the jobs on your schedule and where planners chase updates, then consider which schedule revisions and reports Paloma could run.

Book a call →